Skip to main content

Bandar Utama–Klang line








Bandar Utama–Klang line


From Wikipedia, the free encyclopedia
  (Redirected from Bandar Utama-Klang Line)

Jump to navigation
Jump to search












































Bandar Utama–Klang line

 11 
Rapid KL (brand)
Overview
Native nameLaluan LRT Bandar Utama–Klang
TypeLight rapid transit
System
Rapid KL – LRT KL System 3 (LRT3) – SelTrac CBTC
StatusUnder construction
LocaleKlang Valley
Termini
 BK26  Johan Setia
 BK12  Bandar Anggerik (Phase 1)
 BK1  Bandar Utama (Phase 2)
Stations
Former
25 elevated stations and 1 underground station for six-car trainsets in length

Revised
25 elevated stations and 1 ground level station for a maximum of four-car trainsets in length
Services
Bandar Utama, Petaling Jaya via
Shah Alam to Johan Setia, Klang
Line number
 11  (sky blue)
Websitelrt3.com.my
Operation
Planned opening
Former
Phase 1
31 August 2020; 20 months' time (2020-08-31)
Phase 2
28 February 2021; 2 years' time (2021-02-28)

Revised
Phase 1
31 August 2024; 5 years' time (2024-08-31)
Phase 2
28 February 2025; 6 years' time (2025-02-28)
Owner
Prasarana Malaysia Berhad
Operator(s)
Rapid Rail Sdn Bhd
Conduction systemAutomated and driverless
CharacterElevated
Depot(s)
Johan Setia Depot, Klang
Rolling stock
CRRC Zhuzhou LRV
Width: 2.7 m (8 ft 10 in)
Length: 114.0 m (374.0 ft)
Former
42 six-car trainsets[1]

Revised
22 three-car trainsets
Technical
Line length37 km (23 mi)
Track gauge
1,435 mm (4 ft 8 12 in) standard gauge
Electrification
Third rail, 750 VDC
Operating speed80km/hour
Route map

GKLKV Integrated Transit Map -KwongTN.svg

The 37-kilometer LRT3 (initial name) or LRT Bandar Utama–Klang line (interim name) BKL or formerly known as Shah Alam line (intro name) is a light rapid transit (LRT) line that is slated to be the third LRT system in Klang Valley. The line will be operated by Rapid Rail Sdn Bhd.[2][3] It was announced by the Prasarana Malaysia Berhad (Prasarana) on 24 April 2013.[4][5] The line is currently referred to as Klang Valley LRT Line 3 or LRT3 by Land Public Transport Commission (SPAD).[6]


When completed, the line will be one of the components of the Klang Valley Integrated Transit System.
.mw-parser-output .RMboxbox-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2).mw-parser-output .RMinlinefloat:none;width:100%;margin:0;border:none.mw-parser-output table.routemappadding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto.mw-parser-output .RMirborder:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important.mw-parser-output table.routemap .RMsidisplay:inline;font-size:90%.mw-parser-output table.routemap .RMl1padding:0 3px;text-align:left.mw-parser-output table.routemap .RMr1padding:0 3px;text-align:right.mw-parser-output table.routemap .RMltext-align:right.mw-parser-output table.routemap .RMrtext-align:left.mw-parser-output table.routemap .RMl4padding:0 3px 0 0;text-align:left.mw-parser-output table.routemap .RMr4padding:0 0 0 3px;text-align:right.mw-parser-output table.routemap>tbody>trline-height:1.mw-parser-output table.routemap>tbody>tr>tdpadding:0;width:auto;vertical-align:middle;text-align:center.mw-parser-output .RMir>tbody>trdisplay:inline-table.mw-parser-output .RMir>tbody>tr>tdpadding:0;height:20px;min-height:20px.mw-parser-output .RMir .RMovposition:relative.mw-parser-output .RMir .RMicposition:absolute;left:0px;top:0px;padding:0.mw-parser-output .RMir .RMtxline-height:20px;vertical-align:middle;text-align:center.mw-parser-output .RMir .RMspheight:20px;min-height:20px.mw-parser-output .RMir div>.RMtxposition:absolute.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>divline-height:.975;display:inline-block;vertical-align:middle.mw-parser-output .RMir .RMf_height:5px;min-height:5px;width:20px;min-width:20px.mw-parser-output .RMir .RMfmheight:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto.mw-parser-output .RMir .RMowidth:2.5px;min-width:2.5px.mw-parser-output .RMir .RMcwidth:5px;min-width:5px.mw-parser-output .RMir .RMocwidth:7.5px;min-width:7.5px.mw-parser-output .RMir .RMdwidth:10px;min-width:10px.mw-parser-output .RMir .RModwidth:12.5px;min-width:12.5px.mw-parser-output .RMir .RMcdwidth:15px;min-width:15px.mw-parser-output .RMir .RMocdwidth:17.5px;min-width:17.5px.mw-parser-output .RMir .RM_width:20px;min-width:20px.mw-parser-output .RMir .RM_owidth:22.5px;min-width:22.5px.mw-parser-output .RMir .RM_cwidth:25px;min-width:25px.mw-parser-output .RMir .RM_ocwidth:27.5px;min-width:27.5px.mw-parser-output .RMir .RM_dwidth:30px;min-width:30px.mw-parser-output .RMir .RM_odwidth:32.5px;min-width:32.5px.mw-parser-output .RMir .RM_cdwidth:35px;min-width:35px.mw-parser-output .RMir .RM_ocdwidth:37.5px;min-width:37.5px.mw-parser-output .RMir .RMbwidth:40px;min-width:40px.mw-parser-output .RMir .RMcbwidth:45px;min-width:45px.mw-parser-output .RMir .RMdbwidth:50px;min-width:50px.mw-parser-output .RMir .RMcdbwidth:55px;min-width:55px.mw-parser-output .RMir .RM_bwidth:60px;min-width:60px.mw-parser-output .RMir .RM_cbwidth:65px;min-width:65px.mw-parser-output .RMir .RM_dbwidth:70px;min-width:70px.mw-parser-output .RMir .RM_cdbwidth:75px;min-width:75px.mw-parser-output .RMir .RMswidth:80px;min-width:80px.mw-parser-output .RMir .RMdswidth:90px;min-width:90px.mw-parser-output .RMir .RM_swidth:100px;min-width:100px.mw-parser-output .RMir .RM_dswidth:110px;min-width:110px.mw-parser-output .RMir .RMbswidth:120px;min-width:120px.mw-parser-output .RMir .RMdbswidth:130px;min-width:130px.mw-parser-output .RMir .RM_bswidth:140px;min-width:140px.mw-parser-output .RMir .RM_dbswidth:150px;min-width:150px.mw-parser-output .RMir .RMwwidth:160px;min-width:160px.mw-parser-output .RMir .RM_wwidth:180px;min-width:180px.mw-parser-output .RMir .RMbwwidth:200px;min-width:200px.mw-parser-output .RMir .RM_bwwidth:220px;min-width:220px.mw-parser-output .RMir .RMswwidth:240px;min-width:240px.mw-parser-output .RMir .RM_swwidth:260px;min-width:260px.mw-parser-output .RMir .RMbswwidth:280px;min-width:280px.mw-parser-output .RMir .RM_bswwidth:300px;min-width:300px




Contents





  • 1 Stations


  • 2 Chronology


  • 3 Facts


  • 4 Gallery


  • 5 External links


  • 6 References




Stations[edit]



Location of Bandar Utama–Klang line


A total of 26 stations were planned before the new government revised the scheme, with a proposed two-kilometre distances between them. One atation was to be an underground station, with the other 25 being elevated. The LRT3 will accommodate 6,000 parking bays.


The LRT3 will feature a few interchange stations. The planned interchanges are  SBK09  Bandar Utama of MRT Sungai Buloh-Kajang Line,  KJ27  CGC-Glenmarie of LRT Kelana Jaya Line and  KD14  Klang on the KTM Line .


The alignment is based on the Final Railway Scheme approved by the Land Public Transport Commission (SPAD).


After a revision by the new government, the construction of Persiaran Hishamuddin station, which was supposed to be the only underground station for the line, was cancelled due to its high construction cost and expected low commuter demand in the area. This resulted in the reduction of the number of stations from 26 to 25 stations. Besides, the specifications of the stations were also changed. For instance, the former length of the stations were set for six-car trainsets, but now the proposed stations will be built for a maximum length of four-car trainsets. The changes in specifications are made in order to decrease the construction cost and reduce unnecessary elements from previous specifications.










































































































































Station Code

Working Name

Interim Name

Position

Interchange / Notes

 BK1   SBK09 

Bandar Utama
One Utama
Elevated
Central terminus and Interchange station with  SBK09  Bandar Utama station on the MRT Sungai Buloh–Kajang Line.

 BK2 

Kayu Ara
Damansara Utama
Elevated


 BK3 

BU11
Tropicana
Elevated


 BK4 

Tropicana
Lien Hoe
Elevated
Provisional.

 BK5 

Dataran Prima
Dataran Prima
Elevated


 BK6 

Kelana Indah
Persada Plus
Elevated


 BK7   KJ27 

Glenmarie

Elevated
Interchange with  KJ27  Glenmarie station on the LRT Kelana Jaya Line.

 BK8 

Temasya
Temasya
Elevated
Provisional.

 BK9 

Persiaran Kerjaya
Glenmarie
Elevated


 BK10 

Malawati
Stadium Shah Alam
Elevated


 BK11 

Persiaran Hishamuddin

Persiaran Hishamuddin
Underground or Ground-level or elevated[7]Cancelled.

 BK12 

Bandar Anggerik

Section 14
Elevated


 BK13 

Seksyen 2

SIRIM
Elevated
Provisional.

 BK14 

UiTM

UiTM
Elevated


 BK15 

Seksyen 7

i-City
Elevated
1.4 KM distance connection to  KD12  Padang Jawa on the KTM Port Klang Line.

 BK16 

Lebuh Keluli
-
Elevated
Provisional.

 BK17 

Bukit Raja

Bukit Raja
Elevated
Provisional.

 BK18 

Pasar Besar Klang

Kawasan 17
Elevated


 BK19 

Jalan Meru

Jalan Meru
Elevated


 BK20   KD14 

Klang

Klang
Elevated
Interchange station with  KD14  Klang on the KTM Port Klang Line.

 BK21 

Taman Selatan

Taman Selatan
Elevated


 BK22 

Sri Andalas

Sri Andalas
Elevated


 BK23 

Bukit Tinggi

TESCO Bukit Tinggi
Elevated
Connected to Tesco Bukit Tinggi shopping mall.

 BK24 

Batu Nilam

AEON Bukit Tinggi
Elevated
Connected to AEON Bukit Tinggi shopping mall.

 BK25 

Bandar Botanik

Bandar Botanik
Elevated
Provisional.

 BK26 

Johan Setia

Johan Setia
Elevated
Western terminus.

Route Map as of October, subject to change


Chronology[edit]


  • 30 May 2014 – The Shah Alam LRT would begin from Bandar Utama, Kelana Jaya, through areas of Glenmarie, HICOM-Glenmarie Industrial Park, Shah Alam Stadium, Shah Alam city centre, UiTM, I-City, Bukit Raja Shopping Centre, Taman Eng Ann, Bandar Klang and then heading straight on to Johan Setia.[8]

  • 17 July 2014 – Following 2015 Budget which is tabled on 10 October 2014, the Prime Minister announced that the government will fund RM9 billion to build the LRT3 project linking Bandar Utama to Shah Alam and Klang, which is already in Prasarana's drawing board.[9]

  • 23 July 2014 – There are several disputes on the proposed routes with the main concern is on the line's integration with the Sungai Buloh-Kajang MRT line.[10]

  • 11 August 2014 – Construction of LRT3 may damage structures, says chairman of chamber [11]

  • 11 October 2014 – The project was approved with an allocation of RM9 billion.[12] This line is no longer be an extension of the LRT Kelana Jaya Line [13] as initially proposed.

  • 13 December 2014 – Prasarana to roll out LRT3 projects by second half of 2015 [14]

  • 11 April 2015 – Tender documents for RM9bil LRT3 project ready for collection [15] LRT3 will be integrated with Kelana Jaya Line in Glenmarie LRT Station, which is currently being built as a part of the Kelana Jaya Line extension project. LRT3 is expected to be used by 300,000 users. The public display of the line will be held for three months beginning in May.[6][16][17]

  • 12 May 2015 – LRT3 works to start by Q1-2016.[18][19][20] LRT3 public display to start on 15 May 2015.[21][22] It will be put up for three months at seven locations – Shah Alam City Council, Petaling Jaya City Council, Public Land Transportation Commission office in Platinum Sentral, Klang Municipal Council and the Kelana Jaya, Masjid Jamek and Pasar Seni LRT stations – from 9am to 5pm on weekdays.[23][24]

  • 4 September 2015 – Prasarana Malaysia Berhad announced that Malaysian Resources Corporation Berhad (MRCB) and George Kent Sdn Bhd joint venture (JV) has been appointed as the Project Delivery Partner (PDP) for the Bandar Utama–Klang (LRT3) project.[25]

  • 20 October 2015 – Prasarana has agreed to change the LRT3 route, which was originally planned to cut through the housing area of Taman Muhibah in Klang to Pasar Besar Klang (Klang wet market) at Jalan Meru. Residents of Taman Muhibah had been objecting the proposed line which would run through their housing area.[26]

  • 24 August 2016 – Official launch of the LRT3 project by the Malaysian Prime Minister Najib Razak.[27]


Facts[edit]


  • The 37-km rail line with 26 stations (25 elevated stations and 1 underground station) is expected to be operational on 31 August 2020.[28]

  • From the 26 stations along the line, 13 stations have the potential for future Transit Oriented Development (TOD).[29]

  • LRT3 is the first rail project in Malaysia that uses green technology applications including water retention, energy efficient and natural air flows.[29]

  • It is seamlessly connected with the:

    • Sungai Buloh–Kajang Line at  SBK09  Bandar Utama terminus


    • Kelana Jaya Line at  KJ27  CGC-Glenmarie LRT station


    • KTM Komuter Port Klang Line at  KD13  Klang station, whereby the proposed new integrated LRT/Komuter station will be located at the KTMB reserve land at Jalan Raya Barat replacing the current Komuter station. This is to fulfil SPAD requirement that the stations must be located next to one another to ensure an integrated public transportation facility. The new Klang Komuter station will be built by Prasarana in line with SPAD’s requirement.[30]


  • LRT3 will be connected with 2 retail malls, namely TESCO Bukit Tinggi and AEON Bukit Tinggi in Bandar Bukit Tinggi, Klang.[31]

  • LRT3 will be equipped with the latest technologies including Communications-Based Train Controls (CBTC), Automatic Train Controls (ATC), Passenger Information Display System (PIDS), fire protection system and closed-circuit television (CCTV) system.

  • LRT3 trains will have a maximum operating speed of 80 km/h (17% faster than the current Kelana Jaya Line) with the capacity of carrying 36,720 passengers per hour per direction.[32]

  • LRT3 is one out of four rapid transit lines in the Klang Valley that does not serve KL Sentral, the other three being the Ampang Line, Sri Petaling Line and the under-construction SSP Line, as well as the first rapid transit line in the Klang Valley that is entirely outside the borders of the Federal Territory of Kuala Lumpur.

  • Reportedly, a planned underground station along Persiaran Hishamuddin is shelved and will possibly be replaced by a ground-level or elevated station instead, following objections from local residents. It will hence leave LRT3 without underground tracks, similar to the Ampang Line and KTM Komuter.[33]


Gallery[edit]





External links[edit]


  • Official LRT3 website

  • MRT and LRT3 Line Integrations

  • Rapid KL, LRT3 service brands


References[edit]




  1. ^ "China's CRRC, Siemens and Tegap Dinamik JV bags RM1.56b light rail vehicle job". Retrieved 2 August 2017..mw-parser-output cite.citationfont-style:inherit.mw-parser-output qquotes:"""""""'""'".mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  2. ^ "Study on LRT from Kelana Jaya to Klang via Shah Alam nears completion". The Star Online. Retrieved 2013-10-21.


  3. ^ "Third LRT to boost Port Klang". The Malay Mail. Archived from the original on 2013-12-13. Retrieved 2013-10-16.


  4. ^ "Shah Alam LRT link in pipeline". Malaysia Chronicle. Retrieved 2013-04-24.


  5. ^ "MY – Malaysia to Add a New LRT Line to Klang?". Bid Ocean Network. Archived from the original on 2013-12-13. Retrieved 2013-05-30.


  6. ^ ab Minderjeet Kaur (17 April 2015). "Sultan's nod for LRT Line 3". New Straits Times.


  7. ^ "LRT3 contractors may see LAD of 100% contract value". The Edge Markets. Retrieved 7 January 2018.


  8. ^ "Shah Alam LRT stops proposed". NST. Retrieved 2014-05-30.


  9. ^ "LRT3 route agreed at over 35km between PJ and Klang". KiniBiz. Retrieved 2014-07-17.


  10. ^ "MRT Corp voices concerns, worried about LRT3 integration point at Bandar Utama". The Star Online.


  11. ^ "Construction of LRT may damage structures, says chairman of chamber". The Star Online. Retrieved 2014-08-11.


  12. ^ "Budget 2015: Boon for construction". The Star Online.


  13. ^ "Kelana Jaya Line". MYrapid. Archived from the original on 2015-05-11. Retrieved 2014-10-11.


  14. ^ "Prasarana to roll out LRT3 projects by second half of 2015". The Star Online.


  15. ^ "Tender documents for RM9bil LRT3 project ready for collection". The Star Online.


  16. ^ Ali, Sharidan M (2015-04-11). "Prasarana says funding offer for LRT3 has to meet objectives – Business News | The Star Online". Thestar.com.my. Retrieved 2015-04-17.


  17. ^ "Prasarana earmarks RM1 billion for land acquisition for LRT3 project". NST Online.


  18. ^ "LRT3 works to start by 1Q16". THE EDGE MARKETS.


  19. ^ "Construction of LRT3 to start in 1Q". The Star Online.


  20. ^ "LRT3 construction work starts Q1 next year". The Sun Daily.


  21. ^ "LRT3 public inspection to start this Friday". The Sun Daily.


  22. ^ "Proposal of LRT3 alignment to be made public on Friday". The Star Online.


  23. ^ "LRT 3 proposal put on display for public feedbacks". The Star Online.


  24. ^ "Prasarana Organises A Public Inspection Of Its Latest Light Rail Transit Line 3 (LRT3) Project". MYrapid.


  25. ^ "Prasarana partners MRCB, George Kent for LRT 3 project". The Malaysian Insider.


  26. ^ "Route change for LRT3 project". The Rakyat Post.


  27. ^ "PM Najib launches LRT3 project, set to benefit two million people by 2020". The New Straits Times.


  28. ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27.


  29. ^ ab "Fakta Menarik LRT3". Prasarana Malaysia. Archived from the original on 2015-06-14. Retrieved 2015-05-17.


  30. ^ "Klang komuter station at risk of being closed". The Star.


  31. ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22.


  32. ^ "Sistem LRT3". Prasarana Malaysia.


  33. ^ "LRT3 contractors may see LAD of 100% contract value". The Edge Markets. Retrieved 7 January 2018.












Retrieved from "https://en.wikipedia.org/w/index.php?title=Bandar_Utama–Klang_line&oldid=866787461"





Navigation menu

























(window.RLQ=window.RLQ||).push(function()mw.config.set("wgPageParseReport":"limitreport":"cputime":"1.680","walltime":"1.959","ppvisitednodes":"value":62687,"limit":1000000,"ppgeneratednodes":"value":0,"limit":1500000,"postexpandincludesize":"value":590827,"limit":2097152,"templateargumentsize":"value":26226,"limit":2097152,"expansiondepth":"value":18,"limit":40,"expensivefunctioncount":"value":98,"limit":500,"unstrip-depth":"value":1,"limit":20,"unstrip-size":"value":90051,"limit":5000000,"entityaccesscount":"value":0,"limit":400,"timingprofile":["100.00% 1492.334 1 -total"," 45.10% 673.039 17 Template:Navbox"," 37.00% 552.235 162 Template:Rint"," 30.99% 462.491 1 Template:Infobox_rail_line"," 29.19% 435.641 1 Template:Infobox"," 16.49% 246.014 1 Template:Reflist"," 14.98% 223.523 1 Template:Klang_Valley_train_stations"," 13.30% 198.413 32 Template:Cite_web"," 11.78% 175.766 1 Template:LRT_Bandar_Utama-Klang_Line"," 11.52% 171.961 1 Template:Routemap"],"scribunto":"limitreport-timeusage":"value":"0.341","limit":"10.000","limitreport-memusage":"value":10065763,"limit":52428800,"cachereport":"origin":"mw1265","timestamp":"20181119005405","ttl":1900800,"transientcontent":false);mw.config.set("wgBackendResponseTime":101,"wgHostname":"mw1327"););

Popular posts from this blog

泉州府

大跃进

马相伯