Tanjung Malim railway station
Tanjung Malim railway station
Jump to navigation
Jump to search
KA15 Tanjung Malim | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Kampung Stesen Tanjong Malim, 35900 Tanjung Malim, Perak, Malaysia | ||||||||||||||||||||
Owned by | Keretapi Tanah Melayu | ||||||||||||||||||||
Line(s) | 2 Port Klang Line (KTM Komuter) ETS KTM ETS | ||||||||||||||||||||
Platforms | 1 side platform & 1 island platform | ||||||||||||||||||||
Tracks | 3 | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Parking | Available, free. | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 1900 | ||||||||||||||||||||
Rebuilt | 2007 | ||||||||||||||||||||
Electrified | 2007 | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
The Tanjung Malim railway station is a Malaysian train station stationed at the north eastern side of and named after the town of Tanjung Malim, Perak. The station provides both Komuter and ETS services.
The station was first constructed in 1900 and at the time, served as the halt for the intercity trains. As part of the Rawang-Ipoh double tracking and electrification project, it was rebuilt in 2007 and reopened two years later, on June 1, 2009, as the final stop in the Rawang-Tanjung Malim shuttle service (formerly known as the Rawang-Kuala Kubu Bharu shuttle service). The service has since 2016 been merged with the Port Klang Line, making Tanjung Malim the northern terminus of the line.
The station, unlike the four other stations along the shuttle route, is situated along three railways with three platforms. Its only similarity with the other stations on the shuttle route is that it also contains facilities normally reserved for medium-to-large stations along three or more lines. In addition to ticketing facilities and basic amenities, the station contains spaces for administrative occupants, as well as a kiosk and an additional foot bridge (fused with a foot bridge exclusively for Komuter users) for pedestrians that simply intend to cross the railway lines. The station also includes low-tech support for disabled passengers. The station exits northeast into a branch road that leads west into the town centre of Tanjung Malim.
The Tanjung Malim station's one side platform and one island platform are designated as Platform 1 (adjoining the main station building at the west, intended for northbound trains), Platform 2 (at the east, intended for southbound trains), and Platform 3.
See also[edit]
Wikimedia Commons has media related to Tanjung Malim Railway Station. |
- Rail transport in Malaysia
References[edit]
"KTM Komuter Services For Rawang - Rasa Sector Launched". Official Keretapi Tanah Melayu website. April 21, 2007. Archived from the original on 2007-08-10. Retrieved 2007-05-03..mw-parser-output cite.citationfont-style:inherit.mw-parser-output qquotes:"""""""'""'".mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em
"KTM Komuter New Route : Rawang - Kuala Kubu Bharu". Official Keretapi Tanah Melayu website. January 2, 2008. Archived from the original on 2007-12-23. Retrieved 2008-01-02.
"KTM Komuter service to Tanjung Malim, Perak (Perkhidmatan KTM Komuter Ke Tanjung Malim, Perak)". Official Keretapi Tanah Melayu website. June 1, 2008. Retrieved 2008-06-03.
External links[edit]
- Tanjung Malim Railway Station
Coordinates: 3°41′04″N 101°31′05″E / 3.68444°N 101.518°E / 3.68444; 101.518
Categories:
- KTM ETS railway stations
- Railway stations in Perak
- Rapid transit stations in Perak
- Rawang-Seremban Line
- Railway stations opened in 1900
(window.RLQ=window.RLQ||).push(function()mw.config.set("wgPageParseReport":"limitreport":"cputime":"0.876","walltime":"1.101","ppvisitednodes":"value":28166,"limit":1000000,"ppgeneratednodes":"value":0,"limit":1500000,"postexpandincludesize":"value":198700,"limit":2097152,"templateargumentsize":"value":23812,"limit":2097152,"expansiondepth":"value":21,"limit":40,"expensivefunctioncount":"value":91,"limit":500,"unstrip-depth":"value":0,"limit":20,"unstrip-size":"value":4647,"limit":5000000,"entityaccesscount":"value":1,"limit":400,"timingprofile":["100.00% 936.756 1 -total"," 47.46% 444.560 1 Template:Infobox_station"," 44.35% 415.432 1 Template:Infobox"," 38.57% 361.263 68 Template:Rint"," 35.77% 335.061 5 Template:Navbox"," 29.65% 277.778 1 Template:Klang_Valley_train_stations"," 25.36% 237.574 2 Template:Br_separated_entries"," 8.03% 75.228 3 Template:Cite_web"," 6.84% 64.079 99 Template:LRT_Station"," 6.75% 63.245 1 Template:Commons_category"],"scribunto":"limitreport-timeusage":"value":"0.161","limit":"10.000","limitreport-memusage":"value":4134762,"limit":52428800,"cachereport":"origin":"mw1263","timestamp":"20181119035724","ttl":1900800,"transientcontent":false);mw.config.set("wgBackendResponseTime":1233,"wgHostname":"mw1263"););